Deep research and operations notes from ZAFTYS: container trucking, TMS, plant TAT, axle and GVW, and how backhaul and capacity networks cut empty kilometres.

Industrial TMS for Indian manufacturing plants is not a highway map. This guide walks the plant control stack - gate, weigh, documents, delivery proof, pay - with inbound vs outbound differences, shortage and settlement visuals, and a demo checklist you can use next week.
Read more
Ocean shocks hit Indian inland depots before they show at the plant gate. This deep guide maps TEU pressure at JNPA and Mundra, separates ocean-box scarcity from trailer scarcity, and covers return-load economics, chassis selection, and hybrid base-plus-overflow capacity with clear units: TEUs, USD, and ₹.
Read more
Most global transportation management systems are built for Western parcel or LTL networks. Indian manufacturers run heavy FTL, multi-axle trailers, spot brokers, weighbridges, and gate queues. This TMS evaluation guide covers the landscape, five pillars, a 25-point demo scorecard, and a six-week rollout. Score vendors on those jobs, not on a map with moving dots.
Read more
Spot market vs dedicated contract fleets for industrial full truckload (FTL) in India: when contract capacity wins, when spot freight rates help, how to size a hybrid freight strategy, cut empty returns, and audit sourcing with a 25-point checklist.
Read more
Plant detention and long truck turnaround time (TAT) often cost more than highway transit on industrial full truckload (FTL). This in-plant logistics and yard management guide covers five-stage TAT, free-time clocks, loading slots, weighbridge lock, and a 25-point plant audit for Indian manufacturers.
Read more
Automate electronic proof of delivery (ePOD), GST e-Way Bill compliance, and freight invoice matching in India. This guide covers paper LR delays, FASTag corridor proof where available, three-way billing match, exception queues, IRN hygiene, and a 25-point finance audit for manufacturers.
Read more
Heavy FTL in India fails when total gross vehicle weight (GVW) looks legal but one axle group is already over MoRTH axle load limits. This guide covers axle load norms, GVW bands, Section 194 overloading fines, industry traps, and a plant weighbridge loop you can audit before the truck hits the highway.
Read more
GPS alone is not a transport management system. The platform must support dispatch, documentation, plant windows, and commercial LCV work, not only a map pin.
Read more
Coils and plates fail quietly when bed type, strapping, or axle planning is wrong. This guide covers the basics shippers and mill teams should align before dispatch.
Read more
Detention and queue time can erase corridor planning. Align tipper capacity, plant windows, and documentation before the vehicle reaches the gate.
Read more
Most freight failures start before the vehicle moves. Align cargo, asset, plant timing, and paperwork in one plan. Include LCV when a trailer is the wrong tool.
Read more
Empty returns waste fuel, time, and margin. Programs improve when corridors, schedules, and marketplace cover are planned together.
Read moreOccasional operational notes and company updates. No spam.